Cascading failure

A failure in a system of interconnected parts in which the failure of one or a few parts leads to the failure of others, growing progressively as a result of positive feedback (encyclopedia); in network science, a process in which a component that becomes dysfunctional leads the components that depend on it, directly or indirectly, to become dysfunctional too, by redistributed load (overload), lost support (dependency) or neighbours past a threshold, until the system reaches a steady state, sometimes an abrupt collapse (Valdez et al. 2020).

Properties published scienceour proposal

Sourced fields, and our own readings.

born atper cascade; as a kind, with the first systems of interconnected parts (rung 5 on the booked reading)
boundaryInside: the chain of failures from the first one to the steady state, the rule by which each failure reaches the next part (load moved on, support lost, a threshold crossed, a claim unpaid) and each part's own test (load against capacity, buffer against shortfall). Outside: the network it runs on and that network's design (its capacities, margins and links), the trigger that starts it, and the defenders (protection, operators, exchanges, central banks) who act on it.
nested levelA process, not a substance: it runs on a host network (a grid, the Internet, a web of bank obligations, a food web, a city's roads) and on coupled networks of networks; its outcome reaches the infrastructures and people that depend on the host.
scaletechnological

Measures (36) published science

Tolerance parameter in the overload modelα > 0 (capacity = (1 + α) × initial load) dimensionless
Nodes affected by a load-based attack on one node (tolerance 0.2)> 60 % of 5000 nodes
Western US grid's graph with shortest-path loads (not a power-flow model): largest component after one high-load node is attacked (tolerance 1)< 50 % of initial size
Critical mean degree, two interdependent ER networks2.445 (single ER network: 1) mean degree
Critical dependency length in interdependent latticesabout 8 lattice spacings
2003 Northeast blackout: people affectedabout 55 million people
2003 Northeast blackout: generating units shut down508 units at 265 plants (encyclopedia, citing the official analysis); 531 units at 261 plants and more than 400 lines (survey); the Task Force report read here gives 'more than 508 generating units at 265 power plants' lost by 16:13 EDT (o135); the 531/261 figure was not found in it
2003 Northeast blackout: power curtailed63 (about 11% of Eastern Interconnection demand) GW
2003 Northeast blackout: NYISO load at the height of the outage28,700 to 5,716 (a loss of 80%) MW
2003 Northeast blackout: surge flow at 4:10:39 p.m.3.7 GW, more than ten times the flow 30 s earlier
2003 Northeast blackout: console refresh time1-3 s to 59 s per screen
2003 Northeast blackout: first tree trip to the big cascade (a cascade clock)3:05 p.m. (Chamberlin-Harding) to 4:10 p.m.; 27 min from the first 345 kV trip to the second
2003 Italy blackout: people affectedabout 56 million people
2003 Italy blackout: time the parallel lines could carry the rerouted flowabout 15 min
2003 Italy blackout: from first trip to separationabout 24 (first trip 03:01, second line 03:25, isolation about 12 s later; UCTE report); the earlier reading 'about 20 to 25' from the encyclopedia and the survey is kept here min
2003 Italy blackout: time from separation to loss of control4 s
2003 Italy blackout: power deficit after separationalmost 6400 MW
2003 Italy blackout: under-frequency trip threshold47.5 Hz
Spatial correlation exponent, Beijing traffic jams at rush hourabout 0.6 exponent γ of C(r) ~ r^-γ
Spatial correlation exponent, 1996 western US blackout failures0.9 to 1.0 exponent γ
Traffic congestion: daily cycle of the correlation length (a clock)peaks at the morning and evening rush hours, extremely small off-peak per day
DebtRank: loss of economic value (distress, not defaults or dollars) from a 10% shock to the 22 top FED borrowers22 to 65 % across periods
FED emergency-loan exposure at its peakabout 1.2 (November 2008) USD trillion
Extra expected loss attributable to the interbank network (EBA banks, bankruptcy cost 0.5)at most 4.2 %
NYSE market-wide circuit breaker levels7, 13, 20 (levels 1 and 2 halt trading at least 15 min) % fall in the S&P 500
Benguela food web: secondary extinctions after removing about 30% of taxa~20 (most-connected), 11 (random), 3 (least-connected) % of taxa
Sanders 2018: harvested parasitoid abundance reduction52 (104.6 to 54.9 per mesocosm) %
Interconnection that cuts the chance of a large cascade (sandpile on coupled grids)70% reduction for p from 0.0005 to 0.075 interconnectivity p
Gmail 2012 outage40% service loss for 18 min %, min
Per-hand-off yield of a defaulted claim (the toll)a defaulting node's assets are further reduced by bankruptcy costs: multiplier γ on the shortfall (0.5 called 'rather large') fraction
2003 Northeast blackout: slow phase, then fast phaseslow: from the first 345 kV trip at 15:05 to the Sammis-Star trip at 16:05:57; fast: complete about three minutes after it picked up speed at 16:08:59, with 508 units lost by 16:13
BPA line outages: average propagation0.28 for outages grouped into cascades (generation 0: 7911, generation 1: 1347), against 0.08 with outage times randomised; 72% of 10,942 automatic outages initial, 28% dependent next-generation outages per outage
US blackouts, customers affected: power-law fit211 blackouts; tail from about 230 ± 90 thousand customers; exponent 2.3(3); p = 0.62; support for a power law 'moderate'
2003 Italy blackout: second line's trip to isolationabout 12 s
2003 Italy blackout: separation to collapse (investigation report)2 min 30 s (frequency reached 47.5 Hz)
2003 Italy blackout: generators tripped before 47.5 Hz by too-conservative settings5 generators, 620 MW

Open contentions (11) open contention

Where sources or readings disagree. Both stay on the map.

Cross-scale patterns seen here (15) our proposal

Shapes that recur when the same kind of problem is solved at different scales, and how each shows in Cascading failure. Each links to every other system that shows it.

Valence: what it trades, and with whom (14) published science

Each exchange with a neighbour, read from both sides: who gains, who pays, and what carries it.

Partners and parts published science

Built from / builds (4)

Sits inside / holds (5)

expressed by (18)

floor filled by (18)

represents (1)

Kinds (9)

Notes published science

Layers

The ways it takes in its world, where they meet, and how it acts back, each from L1 (where it meets the world) up.

cascading failure as network science and engineering describe it (reader's view: the loaded network, the first failure, redistribution, the local test, propagation, the collective state, collapse and response)

  1. L1: The loaded network and its world: parts (lines, routers, banks, species, roads) carrying load (power, packets, money owed, prey, vehicles), each with a capacity set above its load by design and limited by cost
  2. L2: The first failure: a tree flashover, a storm, an attack on a key node, an internal breakdown, a default, a species lost
  3. L3: Redistribution and transmission: load reroutes to neighbours (overload), dependent parts lose support (dependency), neighbours' states change (threshold), unpaid claims pass to creditors
  4. L4: The local test at each part: load against capacity, support present or not, neighbours past threshold, buffer against shortfall; a part that fails it fails (protection trips, the bank defaults, the species goes extinct)
  5. L5: Propagation: rounds of failure and redistribution, within one network and back and forth between networks; fronts at near-constant speed, long jumps, a slow plateau, long-range correlations
  6. L6: The collective state: distance to a critical point; continuous, abrupt or hybrid transitions; metastability; heavy-tailed or bimodal size distributions; self-organized criticality as a contested reading
  7. L7: Collapse and response: what is lost (a blackout, the giant component, a crisis, extinctions) and the responses that come back on the network (protection, islanding, shedding, repair, rules and upgrades)

the boardroom (shared floors)

  1. L4: The local test at each part: load against capacity, support present, neighbours past threshold, buffer against a shortfall; a part that fails it fails. In real grids the test takes three forms: thermal sag to contact (slow), protection answering stress as if it were a fault (fast; zone 3 in 2003), and frequency or voltage limits on generators (seconds) (o130, o136, o144)
  2. L5: Propagation: rounds of failure and redistribution, inside one network and back and forth between networks; near-constant fronts, long jumps, a slow plateau, long-range correlations
  3. L6: The collective state: distance to a critical point, the kind of transition (continuous, abrupt, hybrid), metastability, the size distribution (power law or bimodal)
  4. L7: Collapse and response: the size of what is lost and the defences and repairs that come back on the network

way in: Counterparty losses (obligations between institutions)

  1. L1: The network of liabilities between institutions, the most direct channel for losses
  2. L2: A shortfall in payments from a defaulting debtor
  3. L3: Losses deepen among defaulted banks through their debts to one another (amplification), and DebtRank counts the distress reverberating along all paths

way in: Neighbours' states (threshold rules)

  1. L1: Neighbours' actions or states: adopters of a fad, failed or active neighbours, a market's level
  2. L2: The count or fraction of neighbours past a state (bootstrap and k-core percolation)
  3. L3: Heterogeneous thresholds make global cascades likelier; heterogeneous degrees make them rarer

way in: Redistributed load (flow moved off failed parts)

  1. L1: Load on each part: the shortest paths through a node, the power on a line
  2. L2: Capacity set at (1 + tolerance) times the initial load; line limits from the N-1 criterion
  3. L3: Redistribution: a lost part's flow moves to its neighbours (2003: from Chamberlin-Harding to Hanna-Juniper; Italy: onto parallel lines through France)

way in: Slow stress (load growth and pressure on margins)

  1. L1: A steady increase in loading and economic pressure to use the grid fully
  2. L2: Loading relative to operating limits rises
  3. L3: Margins shrink toward a critical loading; bigger grids break down more abruptly

way in: Support from another network (dependency links)

  1. L1: Another network that supplies a critical resource: power stations powering computers, computers controlling power stations
  2. L2: The dependency link between a node and its supplier; some nodes are autonomous (battery-backed SCADA)
  3. L3: Loss of support: if the supplier fails, the dependent node fails

way in: The initiating shock (hazard, attack, internal breakdown)

  1. L1: The world striking a part: trees grown into a line's path, storms, tsunamis, fires, an attacker
  2. L2: A component faults: an overheated line sags into a tree and flashes over; a trip is recorded
  3. L3: The network loses an element; a small vulnerable set of lines starts most large cascades

way in: What operators and control systems see (alarms, state estimates)

  1. L1: Measurements from the network carried to the control room
  2. L2: The alarm system that flags faults (2003: a software bug stopped it)
  3. L3: Operators' awareness (2003: unaware of the alarm failure for over an hour)
  4. L4: The state estimator and contingency analysis (2003: shut down after anomalous results)

way out: Engineering and rules that rebuild the network

  1. L1: The network gets margins and links back; adding interconnection helps up to a point and then feeds larger cascades
  2. L6: Critical components to reinforce are picked from simulated cascades
  3. L7: After 2003 the Task Force asked for mandatory, enforceable reliability standards and enforceable right-of-way clearances

way out: Market circuit breakers (trading halts)

  1. L1: Information flows before trading resumes; near the threshold selling may speed up (the magnet effect, contested)
  2. L2: Trading stops for a short time or closes early
  3. L5: The index falls past a level set that morning (7%, 13%, 20%)

way out: Protection trips (a part taken out at its limit)

  1. L1: The element is dark and its load is gone or moved (2003: NYISO load down 80%)
  2. L2: The relay or breaker opens; under-frequency protection trips the generators
  3. L4: The part fails its test. In models: current over a threshold (o129). In real grids three forms: slow thermal sag into a tree (minutes; o136, o141); fast relay operation on stressed conditions read as faults, zone 3 in 2003 (o130, o132); generators tripping on under-frequency or under-voltage within seconds (o81, o144)
  4. L5: The cascade's next round reaches a part

way out: Restoration (black start, islands, re-synchronising)

  1. L1: Supply back to customers over hours (Italy: 12 hours; 2003: most places by midnight)
  2. L5: Black-start units that must start without the grid, some failing to
  3. L7: Restoration strategy: build as many islands as possible, then join them

way out: Shedding, islanding and intentional removal (defence)

  1. L1: Less flow left to reroute; the cascade is smaller
  2. L3: Islanding and selective removal of low-load nodes and high-excess edges right after the first failure
  3. L5: Under-frequency and under-voltage load shedding inside a small time window
  4. L7: Operators choose to lose some load to keep the whole

way out: Spill into the systems that depend on it

  1. L1: People's world: four million under a boil-water advisory; 30,000 stranded by cancelled trains
  2. L3: Dependent services stop: pumps without power, cell sites' generators out of fuel, trains halted
  3. L7: The outcome reaches the infrastructures that depend on the failed network

Who fills each layer

Sources (25) published science

Valdez LD, Shekhtman L, La Rocca CE, Zhang X, Buldyrev SV, Trunfio PA, Braunstein LA, Havlin S (2020). Cascading failures in complex networks. Journal of Complex Networks 8(2):cnaa013. doi:10.1093/comnet/cnaa013 (arXiv 2007.11075; read in full, references skipped)
Dobson I, Carreras BA, Lynch VE, Newman DE (2007). Complex systems analysis of series of blackouts: cascading failure, critical points, and self-organization. Chaos 17:026103. doi:10.1063/1.2737822 (abstract only: the portal reached no body) (behind its links)
Glasserman P, Young HP (2015). How likely is contagion in financial networks? Journal of Banking & Finance 50:383-399. doi:10.1016/j.jbankfin.2014.02.006 (sections read through OpenAlex's stored text: introduction, contagion and amplification, bankruptcy costs, conclusions; the proofs skimmed) (behind its links)
Haes Alhelou H, Hamedani-Golshan ME, Njenda TC, Siano P (2019). A survey on power system blackout and cascading events: research motivations and challenges. Energies 12(4):682. doi:10.3390/en12040682 (CC BY; sections read: introduction, the protection schemes, the major blackouts of 2003) (behind its links)
Li D, Jiang Y, Kang R, Havlin S (2014). Spatial correlation analysis of cascading failures: congestions and blackouts. Scientific Reports 4:5381. doi:10.1038/srep05381 (CC BY-NC-SA; read in full, supplement not read) (behind its links)
Trading curb (Wikipedia; sections: lead, United States history, Limit Up-Limit Down) (behind its links)
Sanders D, Thébault E, Kehoe R, van Veen FJF (2018). Trophic redundancy reduces vulnerability to extinction cascades. PNAS 115(10):2419-2424. doi:10.1073/pnas.1716825115 (CC BY-NC-ND; read in full, supplement not read) (behind its links)
Northeast blackout of 2003 (Wikipedia, via WME) (behind its links)
U.S.-Canada Power System Outage Task Force (2004). Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations (public government report, 238 pp.; sections read: the recommendation titles, the background on thermal, voltage and stability limits and the single-contingency rule, chapter 6 on how the cascade evolved with its zone 3 relay section) (behind its links)
Cascading failure (Wikipedia, via WME) (behind its links)
Glasserman P, Young HP (2016). Contagion in financial networks. Journal of Economic Literature 54(3). doi:10.1257/jel.20151228 (sections read through OpenAlex's stored text: introduction, section 2 episodes, sections 3-5 in full, 6, 7.2, 8.7, 9.1-9.4, 10-13; sections 7-8 formulas skimmed) (behind its links)
Motter AE, Lai Y-C (2002). Cascade-based attacks on complex networks. Physical Review E 66:065102 (arXiv cond-mat/0301086; read in full) (behind its links)
Buldyrev SV, Parshani R, Paul G, Stanley HE, Havlin S (2010). Catastrophic cascade of failures in interdependent networks. Nature 464:1025-1028. doi:10.1038/nature08932 (arXiv:0907.1182) (behind its links)
2003 Italy blackout (Wikipedia, Wikimedia Enterprise) (behind its links)
UCTE (2004). Final Report of the Investigation Committee on the 28 September 2003 Blackout in Italy (April 2004; sections read: the summary sequence of events, the timed line trips, the causes of generator trips before and after 47.5 Hz, restoration and the telecommunications outage) (behind its links)
Battiston S, Puliga M, Kaushik R, Tasca P, Caldarelli G (2012). DebtRank: too central to fail? Financial networks, the FED and systemic risk. Scientific Reports 2:541. doi:10.1038/srep00541 (CC BY-NC-SA; read in full, supplement not read) (behind its links)
Dunne JA, Williams RJ, Martinez ND (2004). Network structure and robustness of marine food webs. Marine Ecology Progress Series 273:291-302. doi:10.3354/meps273291 (sections read: methods of the extinction analysis, structural robustness results and discussion) (behind its links)
Brummitt CD, D'Souza RM, Leicht EA (2012). Suppressing cascades of load in interdependent networks. PNAS 109(12):E680-E689 (arXiv 1106.4499v2; sections read: abstract, the summary of results and its figure A1, the model) (behind its links)
Dobson I, Carreras BA, Newman DE, Reynolds-Barredo JM (2016). Obtaining statistics of cascading line outages spreading in an electric transmission network from standard utility data. IEEE Transactions on Power Systems. doi:10.1109/TPWRS.2016.2523884 (arXiv 1507.04277; sections read: abstract, section VI with Table II, conclusions) (behind its links)
Clauset A, Shalizi CR, Newman MEJ (2009). Power-law distributions in empirical data. SIAM Review 51:661-703. doi:10.1137/070710111 (arXiv 0706.1062; sections read: the blackout rows of Tables 6.1 and 6.2 and the discussion of the comparisons in section 6) (behind its links)
Motter AE (2004). Cascade control and defense in complex networks. Physical Review Letters 93:098701 (arXiv cond-mat/0401074; sections read: abstract, introduction, the method of defence) (behind its links)
Watts DJ (2002) A simple model of global cascades on random networks. PNAS 99:5766-5771, doi:10.1073/pnas.082090499 (behind its links)
Pahwa S, Scoglio C, Scala A (2014). Abruptness of cascade failures in power grids. Scientific Reports 4:3694. doi:10.1038/srep03694 (CC BY-NC-ND; read in full, methods skimmed) (behind its links)
Hines PDH, Dobson I, Rezaei P (2017). Cascading power outages propagate locally in an influence graph that is not the actual grid topology. IEEE Transactions on Power Systems. doi:10.1109/TPWRS.2016.2578259 (arXiv 1508.01775v2; sections read: abstract, introduction, the influence graph's definition) (behind its links)
Hines P, Cotilla-Sanchez E, Blumsack S (2010). Do topological models provide good information about vulnerability in electric power networks? Chaos 20:033122. doi:10.1063/1.3489887 (arXiv 1002.2268; abstract read, with one passage of the conclusions) (behind its links)