Cascading failure
A failure in a system of interconnected parts in which the failure of one or a few parts leads to the failure of others, growing progressively as a result of positive feedback (encyclopedia); in network science, a process in which a component that becomes dysfunctional leads the components that depend on it, directly or indirectly, to become dysfunctional too, by redistributed load (overload), lost support (dependency) or neighbours past a threshold, until the system reaches a steady state, sometimes an abrupt collapse (Valdez et al. 2020).
Properties published scienceour proposal
Sourced fields, and our own readings.
| born at | per cascade; as a kind, with the first systems of interconnected parts (rung 5 on the booked reading) |
| boundary | Inside: the chain of failures from the first one to the steady state, the rule by which each failure reaches the next part (load moved on, support lost, a threshold crossed, a claim unpaid) and each part's own test (load against capacity, buffer against shortfall). Outside: the network it runs on and that network's design (its capacities, margins and links), the trigger that starts it, and the defenders (protection, operators, exchanges, central banks) who act on it. |
| nested level | A process, not a substance: it runs on a host network (a grid, the Internet, a web of bank obligations, a food web, a city's roads) and on coupled networks of networks; its outcome reaches the infrastructures and people that depend on the host. |
| scale | technological |
Measures (36) published science
| Tolerance parameter in the overload model | α > 0 (capacity = (1 + α) × initial load) dimensionless |
| Nodes affected by a load-based attack on one node (tolerance 0.2) | > 60 % of 5000 nodes |
| Western US grid's graph with shortest-path loads (not a power-flow model): largest component after one high-load node is attacked (tolerance 1) | < 50 % of initial size |
| Critical mean degree, two interdependent ER networks | 2.445 (single ER network: 1) mean degree |
| Critical dependency length in interdependent lattices | about 8 lattice spacings |
| 2003 Northeast blackout: people affected | about 55 million people |
| 2003 Northeast blackout: generating units shut down | 508 units at 265 plants (encyclopedia, citing the official analysis); 531 units at 261 plants and more than 400 lines (survey); the Task Force report read here gives 'more than 508 generating units at 265 power plants' lost by 16:13 EDT (o135); the 531/261 figure was not found in it |
| 2003 Northeast blackout: power curtailed | 63 (about 11% of Eastern Interconnection demand) GW |
| 2003 Northeast blackout: NYISO load at the height of the outage | 28,700 to 5,716 (a loss of 80%) MW |
| 2003 Northeast blackout: surge flow at 4:10:39 p.m. | 3.7 GW, more than ten times the flow 30 s earlier |
| 2003 Northeast blackout: console refresh time | 1-3 s to 59 s per screen |
| 2003 Northeast blackout: first tree trip to the big cascade (a cascade clock) | 3:05 p.m. (Chamberlin-Harding) to 4:10 p.m.; 27 min from the first 345 kV trip to the second |
| 2003 Italy blackout: people affected | about 56 million people |
| 2003 Italy blackout: time the parallel lines could carry the rerouted flow | about 15 min |
| 2003 Italy blackout: from first trip to separation | about 24 (first trip 03:01, second line 03:25, isolation about 12 s later; UCTE report); the earlier reading 'about 20 to 25' from the encyclopedia and the survey is kept here min |
| 2003 Italy blackout: time from separation to loss of control | 4 s |
| 2003 Italy blackout: power deficit after separation | almost 6400 MW |
| 2003 Italy blackout: under-frequency trip threshold | 47.5 Hz |
| Spatial correlation exponent, Beijing traffic jams at rush hour | about 0.6 exponent γ of C(r) ~ r^-γ |
| Spatial correlation exponent, 1996 western US blackout failures | 0.9 to 1.0 exponent γ |
| Traffic congestion: daily cycle of the correlation length (a clock) | peaks at the morning and evening rush hours, extremely small off-peak per day |
| DebtRank: loss of economic value (distress, not defaults or dollars) from a 10% shock to the 22 top FED borrowers | 22 to 65 % across periods |
| FED emergency-loan exposure at its peak | about 1.2 (November 2008) USD trillion |
| Extra expected loss attributable to the interbank network (EBA banks, bankruptcy cost 0.5) | at most 4.2 % |
| NYSE market-wide circuit breaker levels | 7, 13, 20 (levels 1 and 2 halt trading at least 15 min) % fall in the S&P 500 |
| Benguela food web: secondary extinctions after removing about 30% of taxa | ~20 (most-connected), 11 (random), 3 (least-connected) % of taxa |
| Sanders 2018: harvested parasitoid abundance reduction | 52 (104.6 to 54.9 per mesocosm) % |
| Interconnection that cuts the chance of a large cascade (sandpile on coupled grids) | 70% reduction for p from 0.0005 to 0.075 interconnectivity p |
| Gmail 2012 outage | 40% service loss for 18 min %, min |
| Per-hand-off yield of a defaulted claim (the toll) | a defaulting node's assets are further reduced by bankruptcy costs: multiplier γ on the shortfall (0.5 called 'rather large') fraction |
| 2003 Northeast blackout: slow phase, then fast phase | slow: from the first 345 kV trip at 15:05 to the Sammis-Star trip at 16:05:57; fast: complete about three minutes after it picked up speed at 16:08:59, with 508 units lost by 16:13 |
| BPA line outages: average propagation | 0.28 for outages grouped into cascades (generation 0: 7911, generation 1: 1347), against 0.08 with outage times randomised; 72% of 10,942 automatic outages initial, 28% dependent next-generation outages per outage |
| US blackouts, customers affected: power-law fit | 211 blackouts; tail from about 230 ± 90 thousand customers; exponent 2.3(3); p = 0.62; support for a power law 'moderate' |
| 2003 Italy blackout: second line's trip to isolation | about 12 s |
| 2003 Italy blackout: separation to collapse (investigation report) | 2 min 30 s (frequency reached 47.5 Hz) |
| 2003 Italy blackout: generators tripped before 47.5 Hz by too-conservative settings | 5 generators, 620 MW |
Open contentions (11) open contention
Where sources or readings disagree. Both stay on the map.
- C-1468 Are big blackouts a sign the grid runs itself to the edge?
booked: The map keeps both: the 'self-organised criticality' reading, and other explanations for the pattern of outage sizes.
the other reading: that the grid sits at a critical point is not shown by the size distribution alone; the model behaviours listed before (bimodal sizes when all overloaded lines go at once, o17; Watts's bimodal regime, o43; Pahwa's first-order transition, o56) answer neither this nor the size question. The question of sizes is split off as C-4116. No ruling. - C-4116 Do blackout sizes follow a power law?
booked: The map records that sizes are heavy-tailed and that a power law is plausible but not shown.
the other reading: other heavy-tailed forms (log-normal, power law with cutoff) were not ruled out in the tables read. No ruling. - C-4119 Do stock-market circuit breakers calm a fall or speed it up?
booked: The map keeps both readings side by side and rules on neither.
the other reading: the magnet effect: nearing the threshold speeds selling (Goldstein and Kavajecz 2004, as the encyclopedia reports it; the paper was not read). No ruling. - C-4130 How much do bank failures spread through direct debts?
booked: The map keeps the small measured spillovers beside the model in which distress spreads widely.
the other reading: distress reverberating through the network is large: a 10% shock to the 22 top FED borrowers gives 22-65% total loss and every one of them is systemically important at the peak (Battiston et al. 2012, DebtRank). The two measure different things (defaults by direct obligation against distress along all paths). No ruling. - C-4140 Do links between networks make them more fragile or safer?
booked: The map keeps the result that dependence makes collapse abrupt beside the result that some connection suppresses the largest failures.
the other reading: some interconnection suppresses the largest cascades and only too much is harmful (Brummitt et al. 2012, sandpile); networks built to support another (SCADA) raise its reliability unless their failure brings down what they serve (Valdez et al., conclusions). Which holds depends on the failure rule. No ruling. - C-4149 On what date was the 2003 Italian blackout?
booked: The map uses 28 September 2003, as the official investigation gives it, and keeps the survey's other date beside it.
the other reading: 23 September 2003 (Haes Alhelou et al. 2019, whose same paragraph places the Swedish-Danish blackout on 23 September). The UCTE report was not read. No ruling. - C-4150 How fast did Italy's grid collapse in 2003: four seconds or two and a half minutes?
booked: The map keeps both figures; they may time different moments.
the other reading: isolation about 12 s after the second line's loss and collapse 2 min 30 s after separation (UCTE report, o142, o143). The two may time different moments. No ruling. - C-4151 Did the failure of communications speed up the 2003 Italian blackout?
booked: The map keeps the official report, which places the communications outage in the recovery, beside the papers that use it as a case of two networks pulling each other down.
the other reading: breakdowns of communication and transport accelerated the grid's failure (Valdez et al., citing Rosato et al., o21; Rosato not read). No ruling. - C-4166 How many power plants went down in the 2003 North American blackout?
booked: The map uses the official report's figure (more than 508 units at 265 plants) and keeps a survey's different count beside it.
the other reading: 531 generating units at 261 power plants and more than 400 lines tripped (Haes Alhelou et al. 2019). The official report itself was not read. No ruling. - C-4184 Can the shape of a power grid alone predict how failures spread?
booked: The map keeps the simple shape-based models beside the finding that real grid failures jump to distant lines.
the other reading: topological dependency models (mutual percolation) capture interdependent infrastructure; Valdez et al. themselves say that model cannot be applied directly to the grid and SCADA. No ruling. - C-4186 Why could the 2003 blackout not be stopped once it sped up?
booked: The map keeps the official finding (automatic devices acted faster than people or controls) beside the general claim that no warning can outrun the overload.
the other reading: the control signal is no faster than the propagating overload, so no warning can be sent ahead (encyclopedia, o63). No ruling.
Cross-scale patterns seen here (15) our proposal
Shapes that recur when the same kind of problem is solved at different scales, and how each shows in Cascading failure. Each links to every other system that shows it.
- lightning (structural)
Stored stress released at once, after which the network is not the same: Italy lost control within 4 s of separation and every generator tripped at 47.5 Hz (o80, o81); 2003 flow went to ten times its value of 30 s earlier (o67). Random failures rarely start cascades; a key node does (o7, o8). - same role, different builds (structural)
One job, keeping a failure from spreading, done by unrelated builds: islanding a grid into parts (o28), market circuit breakers that halt trading (o106), redundant feeding links in a food web (o121), sections of a computer network timing out (o113), battery-backed autonomous SCADA nodes (o29), a fac - The carry (structural)
Overflow passed on: a part past its capacity topples and sheds its load onto its neighbours, which may topple in turn (sandpile, o46; overload model, o5; 2003: load from Chamberlin-Harding moved to Hanna-Juniper, o66). The wait: the parallel lines in Italy could carry the rerouted flow about 15 min - trade one property for another (structural)
A dial between small and large cascades: isolation suppresses the smallest cascades and worsens the largest; some interconnection cuts large cascades by 70%; too much adds capacity and load that fuel larger ones, so an optimum p* sits between (o47, o48); suppressing small blackouts may raise large-b - who opens the door (structural)
At each crossing of the cascade: the protection relay is a port installed ahead of time by the operator (route 1); the dependency link is a door built into the dependent node's design (route 2); the creditor's claim was booked when it lent (route 3); a storm or a tree strikes through open field (o3) - causal ceiling (partial)
No controller can get ahead of a grid cascade in real time: the control signal is no faster than the overload, so no warning can be sent ahead to isolate an element (o63). - holding / entrainment (partial)
The whole sets when its parts die: when Italy's frequency fell to 47.5 Hz every generator was tripped by its under-frequency protection (o81). - runaway from an unstable balance (partial)
Near the interdependent threshold the system is metastable: small additional damage brings complete collapse (Valdez, the passage around Fig. 2); each trip raises the others' load (o2). - same shape, opposite sign (partial)
One mechanism, a breaker opening a line, run both ways: opened by protection at a part's limit it passes the load on and spreads the cascade (o81, o91); opened by operators to island the grid it contains it (o28, o58). The cascade's own fragmenting of the network (Divide) and islanding (Enclave) are - smooth to sharp in finite time (partial)
The giant component falls smoothly with damage until, at a finite threshold, it collapses abruptly (hybrid transition, o25); in grids the breakdown becomes first order as the system grows (o56). - templating (partial)
One rule reused unchanged across systems: a threshold or capacity rule on a network explains cascades 'as diversely as cultural fads, collective action, the diffusion of norms and innovations, and cascading failures in infrastructure' (o45); the sandpile is called a paradigm from neuronal avalanches - The Payment to Entropy (partial)
Each hand-off of a defaulted claim pays a toll: bankruptcy costs (legal fees, delays, lost intermediation) reduce a failed node's assets beyond the shortfall, and these deadweight losses expand the set of defaults (Glasserman and Young, bankruptcy-cost section; booked as a measure). Form: material ( - the whole sets the local reference (partial)
Each part's capacity is set as (1 + α) times its initial load, and that load is the number of shortest paths through it, a property of the whole network (o5; Motter and Lai). After any failure the whole recomputes every part's load against that fixed local reference. - red-queen (surface)
Asymmetric interdependent grids may be led into an arms race for greater capacity (o49). - Umwelt: each system carves its own slice of one shared medium (surface)
The cascade hears a different slice of its host depending on the network: power flow in grids, unpaid claims in banks, prey and hosts in food webs, vehicles in cities (channels ch-load, ch-exposure, ch-trigger).
Valence: what it trades, and with whom (14) published science
Each exchange with a neighbour, read from both sides: who gains, who pays, and what carries it.
- Trophic network (food webs: who eats whom, from primary production through consumers to decomposers) via sys:trophic-network · Cascading failure gain
- Human (Homo sapiens) via sys:sensory-environment · Cascading failure mixed
- Internet via sys:electromagnetic-field · Cascading failure gain
- Financial market via sys:economy · Cascading failure gain
- Complex network (scale-free growth, preferential attachment, small worlds; walked as an idea) via sys:complex-network · Cascading failure mixed
- Electrical grid via sys:electricity · Cascading failure gain
- Weather via sys:atmosphere-of-earth · Cascading failure gain
- Central bank via sys:economy · Cascading failure loss
- Road network via sys:complex-network · Cascading failure gain
- Computer network via sys:electromagnetic-field · Cascading failure mixed
- Trees along the lines via sys:electricity · Cascading failure gain
- Critical infrastructure via sys:infrastructure · Cascading failure gain
- Lender of last resort via sys:economy · Cascading failure loss
- Attacker on a network via sys:complex-network · Cascading failure gain
Partners and parts published science
Built from / builds (4)
- Complex network (scale-free growth, preferential attachment, small worlds; walked as an idea)
- Each part's limit and trip
- The redistribution rule
- Zone 3 distance relays (real-grid trips on overload)
Sits inside / holds (5)
- Financial contagion
- Trophic network (food webs: who eats whom, from primary production through consumers to decomposers)
- Financial market
- Electrical grid
- Critical infrastructure
expressed by (18)
- Evolvability/Plasticity Engineering (Design for Future Variation)
- Internal Coordination/Regulation
- Offline Simulation & Replay-Guided Planning
- Speed
- Precision Attack
- Resource Denial/Attrition
- Leverage Host/Amplification
- Divide & Isolate
- Quick Harm Avoidance
- Reactive Response
- Proactive Defense
- Self-Monitoring
- Delay/Redirection Tactics
- Enclave/Segregation
- Resilience & Repair
- Redundancy & Diversity
- Altruistic Containment
- Bridging Supply Gaps (Store & Dormancy)
floor filled by (18)
- Trophic network (food webs: who eats whom, from primary production through consumers to decomposers)
- Human (Homo sapiens)
- Engineering (design)
- Internet
- Financial market
- Complex network (scale-free growth, preferential attachment, small worlds; walked as an idea)
- Electrical grid
- Weather
- Percolation
- Central bank
- Road network
- Self-organized criticality (the sandpile family)
- Computer network
- Trees along the lines
- Critical infrastructure
- Each part's limit and trip
- Attacker on a network
- Bank balance sheet
represents (1)
Kinds (9)
- Financial contagion
- Progressive collapse
- Overload cascade
- Cascade in interdependent networks
- Threshold cascade (complex contagion)
- Extinction cascade (secondary extinctions)
- Cascade failure in computer networks (congestion collapse)
- Fracture cascade
- Traffic congestion cascade
Notes published science
- In a model, suppressing small blackouts can make the big ones likelier: in a sandpile model of two coupled grids, cutting the link between them suppresses their smallest cascades most but worsens the largest, while a little interconnection cuts the chance of a large cascade by 70% (src:brummitt-2012-sandpile; Dobson's group gives the same warning for real grids, src:dobson-2007-chaos).
- In the 2003 North American blackout the control-room alarm system had silently failed and the operators' screens slowed from refreshing every 1-3 seconds to every 59 seconds; they did not know for over an hour. Then, once it sped up, relays that took heavy load for a fault tripped line after line, and the cascade was complete within minutes (src:wp:northeast-blackout-of-2003; src:taskforce-2004).
- Beijing's traffic jams 'attract' each other: at rush hour congested roads are correlated across the whole city, the correlation falling off only as a power of distance, and the reach of that correlation swells toward each morning and evening peak (src:li-2014-spatial).
Layers
The ways it takes in its world, where they meet, and how it acts back, each from L1 (where it meets the world) up.
cascading failure as network science and engineering describe it (reader's view: the loaded network, the first failure, redistribution, the local test, propagation, the collective state, collapse and response)
- L1: The loaded network and its world: parts (lines, routers, banks, species, roads) carrying load (power, packets, money owed, prey, vehicles), each with a capacity set above its load by design and limited by cost
- L2: The first failure: a tree flashover, a storm, an attack on a key node, an internal breakdown, a default, a species lost
- L3: Redistribution and transmission: load reroutes to neighbours (overload), dependent parts lose support (dependency), neighbours' states change (threshold), unpaid claims pass to creditors
- L4: The local test at each part: load against capacity, support present or not, neighbours past threshold, buffer against shortfall; a part that fails it fails (protection trips, the bank defaults, the species goes extinct)
- L5: Propagation: rounds of failure and redistribution, within one network and back and forth between networks; fronts at near-constant speed, long jumps, a slow plateau, long-range correlations
- L6: The collective state: distance to a critical point; continuous, abrupt or hybrid transitions; metastability; heavy-tailed or bimodal size distributions; self-organized criticality as a contested reading
- L7: Collapse and response: what is lost (a blackout, the giant component, a crisis, extinctions) and the responses that come back on the network (protection, islanding, shedding, repair, rules and upgrades)
the boardroom (shared floors)
- L4: The local test at each part: load against capacity, support present, neighbours past threshold, buffer against a shortfall; a part that fails it fails. In real grids the test takes three forms: thermal sag to contact (slow), protection answering stress as if it were a fault (fast; zone 3 in 2003), and frequency or voltage limits on generators (seconds) (o130, o136, o144)
- L5: Propagation: rounds of failure and redistribution, inside one network and back and forth between networks; near-constant fronts, long jumps, a slow plateau, long-range correlations
- L6: The collective state: distance to a critical point, the kind of transition (continuous, abrupt, hybrid), metastability, the size distribution (power law or bimodal)
- L7: Collapse and response: the size of what is lost and the defences and repairs that come back on the network
way in: Counterparty losses (obligations between institutions)
- L1: The network of liabilities between institutions, the most direct channel for losses
- L2: A shortfall in payments from a defaulting debtor
- L3: Losses deepen among defaulted banks through their debts to one another (amplification), and DebtRank counts the distress reverberating along all paths
way in: Neighbours' states (threshold rules)
- L1: Neighbours' actions or states: adopters of a fad, failed or active neighbours, a market's level
- L2: The count or fraction of neighbours past a state (bootstrap and k-core percolation)
- L3: Heterogeneous thresholds make global cascades likelier; heterogeneous degrees make them rarer
way in: Redistributed load (flow moved off failed parts)
- L1: Load on each part: the shortest paths through a node, the power on a line
- L2: Capacity set at (1 + tolerance) times the initial load; line limits from the N-1 criterion
- L3: Redistribution: a lost part's flow moves to its neighbours (2003: from Chamberlin-Harding to Hanna-Juniper; Italy: onto parallel lines through France)
way in: Slow stress (load growth and pressure on margins)
- L1: A steady increase in loading and economic pressure to use the grid fully
- L2: Loading relative to operating limits rises
- L3: Margins shrink toward a critical loading; bigger grids break down more abruptly
way in: Support from another network (dependency links)
- L1: Another network that supplies a critical resource: power stations powering computers, computers controlling power stations
- L2: The dependency link between a node and its supplier; some nodes are autonomous (battery-backed SCADA)
- L3: Loss of support: if the supplier fails, the dependent node fails
way in: The initiating shock (hazard, attack, internal breakdown)
- L1: The world striking a part: trees grown into a line's path, storms, tsunamis, fires, an attacker
- L2: A component faults: an overheated line sags into a tree and flashes over; a trip is recorded
- L3: The network loses an element; a small vulnerable set of lines starts most large cascades
way in: What operators and control systems see (alarms, state estimates)
- L1: Measurements from the network carried to the control room
- L2: The alarm system that flags faults (2003: a software bug stopped it)
- L3: Operators' awareness (2003: unaware of the alarm failure for over an hour)
- L4: The state estimator and contingency analysis (2003: shut down after anomalous results)
way out: Engineering and rules that rebuild the network
- L1: The network gets margins and links back; adding interconnection helps up to a point and then feeds larger cascades
- L6: Critical components to reinforce are picked from simulated cascades
- L7: After 2003 the Task Force asked for mandatory, enforceable reliability standards and enforceable right-of-way clearances
way out: Market circuit breakers (trading halts)
- L1: Information flows before trading resumes; near the threshold selling may speed up (the magnet effect, contested)
- L2: Trading stops for a short time or closes early
- L5: The index falls past a level set that morning (7%, 13%, 20%)
way out: Protection trips (a part taken out at its limit)
- L1: The element is dark and its load is gone or moved (2003: NYISO load down 80%)
- L2: The relay or breaker opens; under-frequency protection trips the generators
- L4: The part fails its test. In models: current over a threshold (o129). In real grids three forms: slow thermal sag into a tree (minutes; o136, o141); fast relay operation on stressed conditions read as faults, zone 3 in 2003 (o130, o132); generators tripping on under-frequency or under-voltage within seconds (o81, o144)
- L5: The cascade's next round reaches a part
way out: Restoration (black start, islands, re-synchronising)
- L1: Supply back to customers over hours (Italy: 12 hours; 2003: most places by midnight)
- L5: Black-start units that must start without the grid, some failing to
- L7: Restoration strategy: build as many islands as possible, then join them
way out: Shedding, islanding and intentional removal (defence)
- L1: Less flow left to reroute; the cascade is smaller
- L3: Islanding and selective removal of low-load nodes and high-excess edges right after the first failure
- L5: Under-frequency and under-voltage load shedding inside a small time window
- L7: Operators choose to lose some load to keep the whole
way out: Spill into the systems that depend on it
- L1: People's world: four million under a boil-water advisory; 30,000 stranded by cancelled trains
- L3: Dependent services stop: pumps without power, cell sites' generators out of fuel, trains halted
- L7: The outcome reaches the infrastructures that depend on the failed network